Create an Account - Increase your productivity, customize your experience, and engage in information you care about.
Show All Answers
In 2011 the city commission directed the engineering division to assess the conditions of the public sidewalks in the city and determine if deficiencies exist that could promote a hazard, or lead to conditions that could become hazardous in the future. The commission also directed staff to identify locations where sidewalks do not exist and make recommendations as to the feasibility of installing new sidewalks that would further the existing sidewalk network. After this review, the commission directed the engineering division to embark on a sidewalk improvement program to inspect and replace sidewalks in accordance with city code §650 over a six year period from 2012 to 2017. To establish an efficient and cost effective sidewalk program, the Engineering Division uses these selection criteria.
The property owner may contact the city’s contractor directly to arrange for the installation of any driveway or approach work; however this work cannot be added to the city’s sidewalk contract and shall be contracted directly with the contractor.